JSC "KTK-K", Kazakhstan
Ensuring uninterrupted power supply to critical facilities of the main pipeline.

Lead-acid batteries with a capacity of up to 1000 Ah, lithium batteries with a capacity of up to 50 Ah.
The CPC pipeline system is one of the largest investment projects in the energy sector with the participation of foreign capital in the CIS. The length of the Tengiz–Novorossiysk pipeline is 1,511 km; more than two thirds of Kazakhstan's total export oil, as well as raw materials from Russian fields, including those located in the Caspian Sea, are transported along this route. The CPC marine terminal is equipped with three outrigger mooring devices (VPUs) that allow tankers to be safely loaded at a considerable distance from the shore, including in adverse weather conditions.