OOO ARCTIC LNG 2
Development of Salmanovskoye (Utrenneye) oil and gas condensate field. Provision of uninterrupted power supply to ACS and emergency lighting.
Arctic LNG 2 is NOVATEK's 2nd large-capacity liquefied natural gas (LNG) production project after Yamal LNG. The resource base is the Utrenneye field in the YNAO. It is planned to build 3 processing lines with a capacity of 6.6 mln tons each (19.8 mln tons/year of LNG).
The launch of the first line of Arctic LNG-2 is scheduled for 2023.
Special cabinet design
North packaging
Galvanic isolation on inputs/outputs
Equipment acceptance with quality plans